Page 1 of 1

APC1 Power Maintenance

Posted: Fri Feb 07, 2003 8:33 pm
by porcupine
This is a notice to all colocation, and dedicated server customers on the APC1 Masterswitch unit.

This unit is being taken offline for up to 10 minutes sometime in the next 2 weeks to relocate it's power to another source as we're required to move off the current one, which was a semi-temporary configuration as a result of the power disruption back in November.

More details will come, and each customer will be individually notified when the date/time is set, we will be powering down each server from the command prompt at that time to prevent any problems, any users who have not kept us updated with the root password will be required to power their servers down at the given time to avoid data loss, etc. during this short maintenance window.

Regards,