04/08/2003 - 04/09/2003 Power Maintenance/Modifications
Posted: Mon Apr 07, 2003 3:40 am
Hello Everybody, Here's the scoop:
The Power plant that the APC Masterswitch units APC1 Through APC6 Operate off are soon to be decommissioned. Since our arrival in 151 Front in November, we've pushed this power plant to the limits of it's current capacity, and as a result, a new, signifigantly larger power plant has been rolled out, and the old one will be decommissioned.
As a result, APC1 Through APC6 (and all attached clients) will be relocated to the new power feeds between the hours of 11:00pm on 04-08-2003, and 07:00am on 04-09-2003. Priority Colo Staff will fully manage this, and will do soft shutdowns on every server before shutting the APC's down to relocate the power to the new feeds. The APC's will be shutdown and brought up one at a time, we will ensure VIA our port monitoring that every server, and every port thats monitored is back up before we move on to the next.
Priority Colo will *not* be held liable for any servers that cannot be properly shutdown due to lack of proper root passwords. If we cannot login to a server, we will make best efforts to properly shutdown VIA console.
Expected downtime is approximately 5 minutes per MasterSwitch. If we have your current root password on file, you have little/nothing to worry about and this will be completely transparent.
Shared hosting customers on www3 through www6 will also be affected by this. Dedicated and Colocation customers will be notified VIA email also, this thread merely serves as a reference.
Regards,
The Power plant that the APC Masterswitch units APC1 Through APC6 Operate off are soon to be decommissioned. Since our arrival in 151 Front in November, we've pushed this power plant to the limits of it's current capacity, and as a result, a new, signifigantly larger power plant has been rolled out, and the old one will be decommissioned.
As a result, APC1 Through APC6 (and all attached clients) will be relocated to the new power feeds between the hours of 11:00pm on 04-08-2003, and 07:00am on 04-09-2003. Priority Colo Staff will fully manage this, and will do soft shutdowns on every server before shutting the APC's down to relocate the power to the new feeds. The APC's will be shutdown and brought up one at a time, we will ensure VIA our port monitoring that every server, and every port thats monitored is back up before we move on to the next.
Priority Colo will *not* be held liable for any servers that cannot be properly shutdown due to lack of proper root passwords. If we cannot login to a server, we will make best efforts to properly shutdown VIA console.
Expected downtime is approximately 5 minutes per MasterSwitch. If we have your current root password on file, you have little/nothing to worry about and this will be completely transparent.
Shared hosting customers on www3 through www6 will also be affected by this. Dedicated and Colocation customers will be notified VIA email also, this thread merely serves as a reference.
Regards,